Recent Work

This is a list of recent jobs carried out by M K Gover Electrical Contractors.

  • 400Amp supply to feed factory ovens. Wired in SWA cable and the containment was ladder rack where required. This included the supervision of ground workers to dig up the car park route and replace tarmac when finished. Cable was buried using the correct procedures. I.e. depth, sand and tape etc.

  • Complete 1st fix and 2nd fix at school for new workshop. This included new lighting, sockets and isolators for machines. Containment was all installed in steel trunking, lighting trunking and metal conduit. Wired in singles.

  • Changed all old sodium low bays for new T5 fittings with built in sensors on whole of factory floor at Atlas Packaging Barnstaple. The sensors have been set up to the customerís needs and have reduced the carbon footprint and have reduced power consumption.

  • Periodic test of whole of Atlas Packaging Barnstaple. All works carried out through the night to minimise disruptions.

  • Complete 1st fix and 2nd fix of two units of new lighting, containment of tray wired by SWA cable for sockets and isolators for factory machines.

    Please feel free to contact us and we will assist in any way possible.